Fill in Order Details

  • Submit paper details for free using our simple order form

Make Payment Securely

  • Add funds to your account. There are no upfront payments. The writer will only be paid once you have approved your paper

Writing Process

  • The best qualified expert writer is assigned to work on your order
  • Your paper is written to standard and delivered as per your instructions

Download your paper

  • Download the completed paper from your online account or your email
  • You can request a plagiarism and quality report along with your paper

pjm330 effective project scheduling and control mod5 2 discussion post responses and apa cited reference

Please respond to both discussion POST1: and POST2: with at least 200 words and APA cited reference

Required

  • Chapters 7 & 16 in Project Management: A Systems Approach to Planning, Scheduling, and Controlling
  • Part 1: Chapters 2 & 4, and Part 1. Section 9.5 in A Guide to the Project Management Body of Knowledge (PMBOK® Guide)

Recommended

Module 5: Discussion Forum

18 18 unread replies. 30 30 replies.

Project managers are often faced with having to manage trade-offs between competing project objectives. For this discussion, address the following:

  • Describe the triple constraint. What are the three components and what is the relationship between them?
  • Provide a scenario for a project manager not having control over one or more of the constraints.

Integrate the course readings and support the post with appropriate citations and references.

POST1:

Triple constraints refer to the 3 contributing factors that direct the ability to deliver a project. The 3 established constraints are budget (cost), time (schedule), and scope (requirements). Budget refers to the funds allocated to complete the project. Time represents the deadline or duration to complete the work. Scope outlines all the work, products or services to be delivered after the project completion (deliverables). Their relationship is often demonstrated by the triangle shape. The triple constraint states the tradeoff decisions made on projects (Kerzner, 2017) and by adjusting the factor of one, it directly impacts the other two. Project managers are responsible for the balance of these constraints, maintaining the relationships between scope, cost, and schedule anticipated by stakeholders. As one constraint decreases, one or 2 of the other components must increase for the project to succeed as planned.

Within these constraints, some certain events or challenges may happen to a project that is beyond the project manager’s control. Resources are reliant on people, systems, and equipment and if there is a change to say, a key “system” or a piece of “equipment” used in the project, then resourced “people” will be impacted by either also changing or redirecting the work. Regarding the project budget, if there is a change to “revenue,” due to a recession then both “budget” and/or “allocation” of funds will be changed – possibly delaying or canceling the project altogether. Then there are stakeholders involved including owners and decision-makers, and clients receiving the services and benefits of the project product. Changes within one of these individuals or groups may not only potentially affect components in other stakeholders, but might also impact other members in other groups. A change to a decision-maker may influence the customer of the project product. (PMI, 2017)

Reference

Kerzner, H. (2017). Project management: A systems approach to planning, scheduling, and controlling (12th ed.). Hoboken, NJ: Wiley.

Project Management Institute. (2017). A guide to the project management body of knowledge: (PMBOK® guide). Newtown Square, PA, USA.

POST2:

Discussion Board – Module 5

November 4, 2019

Triple Constraint

According to Halsey & Hopkins (2017), the triple constraint consists of time, cost, and scope. These components form a triangle. The triangle is known as the Project Management Triangle, Iron Triangle, or Project Triangle. Each component affects the other components. The relationship between the components is as follows:

  • Increased scope results in increased cost and/or schedule
  • Decreased schedule results in a cost increased and/or decreased scope
  • Decreased cost usually results in decreased scope (Halsey & Hopkins, 2017)

Scenario

The project manager is constantly “juggling” the three project constraints. The PM has to balance the constraints while attempting to keep everyone happy. However, the PM may not always have control over one or more of the constraints. In some cases, the customer or the Project Sponsor may control one of the constraints.

For example, the Project Sponsor may tell the project manager that the scope of the project is to be increased due to change requests from the customer. The PM will then need to analyze how the increased scope will impact the other two constraints. The PM knows that the cost and/or the schedule will need to increase in relation to the increased scope. Once the PM decides which constraint to increase, he or she will need to receive authorization to increase either the cost or the schedule.

References

Kerzner, H. (2017). Project management: A systems approach to planning, scheduling, and controlling (12th ed.). Hoboken, NJ: Wiley.

WHAT OUR CURRENT CUSTOMERS SAY

  • Google
  • Sitejabber
  • Trustpilot
Zahraa S
Zahraa S
Absolutely spot on. I have had the best experience with Elite Academic Research and all my work have scored highly. Thank you for your professionalism and using expert writers with vast and outstanding knowledge in their fields. I highly recommend any day and time.
Stuart L
Stuart L
Thanks for keeping me sane for getting everything out of the way, I’ve been stuck working more than full time and balancing the rest but I’m glad you’ve been ensuring my school work is taken care of. I'll recommend Elite Academic Research to anyone who seeks quality academic help, thank you so much!
Mindi D
Mindi D
Brilliant writers and awesome support team. You can tell by the depth of research and the quality of work delivered that the writers care deeply about delivering that perfect grade.
Samuel Y
Samuel Y
I really appreciate the work all your amazing writers do to ensure that my papers are always delivered on time and always of the highest quality. I was at a crossroads last semester and I almost dropped out of school because of the many issues that were bombarding but I am glad a friend referred me to you guys. You came up big for me and continue to do so. I just wish I knew about your services earlier.
Cindy L
Cindy L
You can't fault the paper quality and speed of delivery. I have been using these guys for the past 3 years and I not even once have they ever failed me. They deliver properly researched papers way ahead of time. Each time I think I have had the best their professional writers surprise me with even better quality work. Elite Academic Research is a true Gem among essay writing companies.
Got an A and plagiarism percent was less than 10%! Thanks!

ORDER NOW


Consider Your Assignments Done

“All my friends and I are getting help from eliteacademicresearch. It’s every college student’s best kept secret!”

Jermaine Byrant
BSN

“I was apprehensive at first. But I must say it was a great experience and well worth the price. I got an A!”

Nicole Johnson
Finance & Economics

Our Top Experts

See Why Our Clients Hire Us Again And Again!


OVER

10.3k
Reviews

RATING
4.89/5
Average

YEARS
13
Mastery

Success Guarantee

When you order form the best, some of your greatest problems as a student are solved!

Reliable

Professional

Affordable

Quick

Using this writing service is legal and is not prohibited by any law, university or college policies. Services of Elite Academic Research are provided for research and study purposes only with the intent to help students improve their writing and academic experience. We do not condone or encourage cheating, academic dishonesty, or any form of plagiarism. Our original, plagiarism-free, zero-AI expert samples should only be used as references. It is your responsibility to cite any outside sources appropriately. This service will be useful for students looking for quick, reliable, and efficient online class-help on a variety of topics.